Dr Milana Petrovića 21
21000 Novi Sad, Srbija
+381.21.6791.888
Sava Bridge - Belgrade
Place: Belgrad, Serbia
Client: City of Belgrade, Joint-Venture PORR-DSD-SCT
Construction period: 2008 - 2012
Type of construction: cable stayed bridge
Contruction weight: 9.000 to
Total length: 964 m
Lenght of spans: 70 m - 108 m - 80 m - 80 m - 376 m - 200 m - 50 m
http://en.wikipedia.org/wiki/Ada_Bridge
New Highway Bridge Beska (Danube)
Place: E-75 Highway Novi Sad - Belgrade
Client: Public Enterprise "Roads of Serbia"
Construction period: 2007 - 2011
Type of construction: main brigde concrete bridge - free cantilever , approach bridges as concrete bridges - movable scaffolding system
Total length: 2205 m
Length of spans : 33 x 45 m - 60 m -105m - 210 m -105 m -60 m- 4 x 45 m
http://en.wikipedia.org/wiki/Beska_Bridge
Reconstruction of Sloboda bridgde (Danube) - Novi Sad
Place: Novi Sad, Serbia
Client: The City of Novi Sad (financed by the European Agency for Reconstruction)
Construction period: 2002 - 2005
Type of construction: main brigde cable stayed bridge, approach bridges as steel composite bridges
Construction weight: 4.464 to
Total length: 1311 m
Length of spans : 10 m - 30m - 4 x 60 m - 591 m - 3 x 60 m
http://en.wikipedia.org/wiki/Liberty_Bridge,_Novi_Sad