Pretraga
Projects
DSD Konstruktion d.o.o.

Dr Milana Petrovića 21
21000 Novi Sad, Srbija

+381.21.6791.888

Sava Bridge - Belgrade

 


Place: Belgrad, Serbia

Client: City of Belgrade, Joint-Venture PORR-DSD-SCT

Construction period: 2008 - 2012

Type of construction: cable stayed bridge

Contruction weight: 9.000 to

Total length: 964 m

Lenght of spans: 70 m - 108 m  -  80 m -  80 m - 376 m - 200 m -  50 m

http://en.wikipedia.org/wiki/Ada_Bridge


 

New Highway Bridge Beska (Danube)


 

Place: E-75 Highway  Novi Sad - Belgrade

Client: Public Enterprise "Roads of Serbia"

Construction period: 2007 - 2011

Type of construction: main brigde concrete bridge - free cantilever , approach bridges as concrete bridges - movable scaffolding system

Total length: 2205 m

Length of spans :  33 x 45 m - 60 m -105m - 210 m -105 m -60 m- 4 x 45 m

http://en.wikipedia.org/wiki/Beska_Bridge


 

Reconstruction of Sloboda bridgde (Danube) - Novi Sad


 

Place: Novi Sad, Serbia

Client: The City of Novi Sad (financed by the European Agency for Reconstruction)

Construction period: 2002 - 2005

Type of construction: main brigde cable stayed bridge, approach bridges as steel composite bridges

Construction weight: 4.464 to

Total length: 1311 m

Length of spans : 10 m - 30m - 4 x 60 m - 591 m - 3 x 60 m

 http://en.wikipedia.org/wiki/Liberty_Bridge,_Novi_Sad